San Diego County

Permits and regulations

One row for each of the county's 19 permit authorities. Every official link was checked on the day shown, and only the authority can confirm the rules for a specific parcel.

19 authorities

AuthorityOfficial pagePre-approved plansWhat differs hereCoastal land
City of San DiegoCity of San Diego pageCity of San Diego

Accepts other plans

Accepts Encinitas's permit-ready plans and the standard plans of the County and Chula Vista, reviewed in 30 days; a designer may also seek pre-approval for a set of their own.

Plans page

  • The ADU Home Density Bonus adds bonus units in exchange for deed-restricted affordable ones, and caps ADUs and JADUs together at four, five or six on a single-family lot by lot size; the cap dates from 2025 amendments not yet in effect in the Coastal Overlay Zone.
  • Most new ADUs in the Coastal Overlay Zone need a Coastal Development Permit, and the 2025 ADU amendments do not apply there until the Coastal Commission certifies them.

Yes

CarlsbadCarlsbad pageCity of Carlsbad

Program, no plans yet

Four free single-story plans, offline while the City updates them to the 2025 codes. They were still listed as unavailable on October 19, 2026.

Plans page

  • Most new ADUs in Carlsbad's Coastal Zone need a minor coastal development permit, which the City Planner decides without a hearing once neighbors have been notified.
  • Detached ADUs cannot have roof decks, and in the Coastal Zone an uncovered parking space lost to an ADU has to be replaced.

Yes

Chula VistaChula Vista pageCity of Chula Vista

Its own plans

Twelve City Standard plans, six sizes between 498 and 1,199 square feet in mirrored pairs, plus approved private designs, reviewed in 14 business days rather than 21.

Plans page

  • ADUs of 750 square feet or more pay development impact fees in proportion to the house, from 2027 on the area above 750 only, and most of those fees can wait until final inspection.
  • The City's ADU loan pilot for low- and moderate-income owners stopped taking applications in June 2024; you can join an interest list in case funding returns.

Yes

CoronadoCoronado pageCity of Coronado

Program, no plans yet

Plans in three architectural styles are being prepared; the City expects them by fall 2026, and a draft went before the Planning Commission on July 14, 2026.

Plans page

  • Coronado allows carriage house ADUs: a two-story detached building with a garage below and a complete home on the upper floor.
  • HCD's December 2025 letter listed 31 problems in the City's ordinance, such as a six-month minimum rental and a ban on selling an ADU separately.

Yes

Del MarDel Mar pageCity of Del Mar

None found

Three sample floor plans of 446 to 955 square feet, open to public use; they are layouts only, so you still need construction drawings.

Plans page

  • Every ADU application is processed as an administrative coastal development permit, under local ADU rules the Coastal Commission certified on June 12, 2025.
  • The ADU Incentive Program trades incentives for renting your ADU to a low-income household for at least 30 years.

Yes

El CajonEl Cajon pageCity of El Cajon

Its own plans

Three City standard plans for detached units (a 560-square-foot studio, a 649-square-foot one-bedroom and an 802-square-foot two-bedroom), drawn to the 2022 codes.

Plans page

  • A deferred City loan helps owner-occupants build an ADU that then stays affordable for at least five years; requests since April 1, 2024 are taken in order of arrival.
  • A February 2025 HCD review flagged ten issues in the City's 2024 ordinance, including attached ADU heights tied to setbacks.

No

EncinitasEncinitas pageCity of Encinitas

Its own plans

Eight plans by Design Path Studio and DZN Partners, 224 to 1,199 square feet and studio to three bedrooms, and since 2025 a program lets private designers seek pre-approval for their own sets; edits mean standard review.

Plans page

  • Encinitas charges no City plan review or inspection fees for an ADU; you still pay state fees, coastal notice postage and County recording fees.
  • Encinitas requires a coastal development permit for most ADUs in its Coastal Zone, after a sign is posted on the property and a legal notice goes out.

Yes

EscondidoEscondido pageCity of Escondido

Its own plans

Four detached plans from 484 to 1,000 square feet, made with RRM Design Group and explained in a guidebook in English and Spanish.

Plans page

  • The City's page caps ADUs at 1,000 square feet, and an ADU that needs sprinklers also needs at least a 1-inch water meter with backflow protection.
  • For the Old Escondido Neighborhood, an adaptation guide shows details you can add to the pre-approved plans to match its historic styles.

No

Imperial BeachImperial Beach pageCity of Imperial Beach

Its own plans

One 600-square-foot plan, posted with a checklist of the site details you supply.

Plans page

  • In the Coastal Zone a new ADU, a conversion of non-habitable space or a garage JADU needs a coastal permit before the building permit, reviewed within 30 calendar days of payment.
  • Where a parcel lies in the Coastal Commission's own permit area, you apply to the Commission instead of the City.

Yes

La MesaLa Mesa pageCity of La Mesa

Its own plans

Five City plans, from a 224-square-foot studio up to a three-bedroom of 1,199 square feet; Planning emails you the construction set on request, and the County's plans are linked too.

Plans page

  • The City says it follows each new state housing law from the day it takes effect, and it sends you to HCD's ADU handbook for the rules.
  • With a City plan you still add energy calculations, plus a soils report when the ADU is over 500 square feet.

No

Lemon GroveLemon Grove pageCity of Lemon Grove

Its own plans

A single 797-square-foot design (one story, two bedrooms, detached) drawn to the 2025 codes, with a streamlined 30-day approval and no changes allowed.

Plans page

  • In December 2025 HCD told the City that its flat 16-foot height limit for detached ADUs and its rule that an ADU's style complement the house break state law.

No

National CityNational City pageCity of National City

None found

The City's ADU page lists its handbook, code sections and application steps, but no plans.

  • The City's March 2024 handbook asks for a 24-inch box tree in the front setback or parkway with an ADU, unless a large tree already stands there.
  • The Fire Department checks that a hose line laid from the curb reaches the farthest point of the ADU within 150 feet.

Yes

OceansideOceanside pageCity of Oceanside

None found

Oceanside's ADU page posts no plan sets.

  • Oceanside is certifying its ADU ordinance with HCD, says its earlier local standards no longer apply, and points you to state law and HCD's handbook meanwhile.
  • HCD's June 2026 findings on the ordinance adopted March 25, 2026 run to 26 items, from parking to setbacks.

Yes

PowayPoway pageCity of Poway

Program, no plans yet

A policy since March 4, 2025 lets architects submit plans and promises users a 30-day review, but none had arrived when it was written and none are posted.

Plans page

  • The City's June 2024 handout asks for 10 feet between a detached ADU and other buildings, and an exterior in keeping with the house.
  • A pre-approved ADU in the very high fire hazard zone also needs a landscaping plan the Fire Department signs off on.

No

San MarcosSan Marcos pageCity of San Marcos

Its own plans

Mostly finished City designs for single-story detached ADUs, decided within 30 days once the application is complete; the City won't take a modified set.

Plans page

  • San Marcos regulates ADUs under Municipal Code Chapter 20.410; in September 2024 the City filed a notice for a proposed rewrite of that chapter to match state ADU law.

No

SanteeSantee pageCity of Santee

Accepts other plans

Santee lets you use the County's, Chula Vista's or Encinitas's pre-approved sets, and notes the County's are free to residents.

Plans page

  • ADUs must meet the CALGreen Tier II voluntary measures and the energy rules in Municipal Code section 13.10.040.
  • The City's ADU fee waiver ended on September 27, 2024, so an ADU now pays the usual fees at permit issuance.

No

Solana BeachSolana Beach pageCity of Solana Beach

Program, no plans yet

Designers can ask the City to pre-approve detached plans no larger than 800 square feet or taller than 16 feet; the planning page lists none so far.

Plans page

  • The City's June 2025 handout asks for a copy of the California Coastal Commission's approval letter with a new ADU's building permit application.
  • In December 2025 HCD called the rule hiding an ADU's entrance from the street subjective, and said the two-ADU cap on multifamily lots falls below the state's limit of up to eight, never more than the existing units.

Yes

VistaVista pageCity of Vista

Its own plans

Four plans from a 499-square-foot studio to a 1,194-square-foot three-bedroom, for lots with an existing house; plan check fees are waived when you use one.

Plans page

  • Under Ordinance 2019-11, some impact fees are waived if you record a ten-year agreement to house a lower-income household, or a family member or caregiver who provides regular care, in the ADU.
  • For the City's plans, grading review by Land Development Engineering comes before plan intake, and a septic lot needs County Health clearance first.

No

Unincorporated San Diego CountyUnincorporated San Diego County pageCounty of San Diego, Planning & Development Services

Its own plans

Six County designs between 600 and 1,200 square feet, downloadable in PDF or CAD and about 85 percent complete; a checklist covers what you add for your lot.

Plans page

  • Since April 4, 2026 you can sell an ADU as a condominium, and sales since September 18, 2026 add a posting period, a right of first refusal and a buyer's occupancy affidavit.
  • In July 2026 HCD found five conflicts with state law in the County's ADU rules, among them owner occupancy for every JADU and replacement parking for garage JADUs.

Yes