Skip to content
Aerial of a new single-story L-shaped ADU with rooftop solar, a concrete patio, a planted terrace behind a block retaining wall and a detached garage, among trees, built by BHI Builders

ADU design-build · San Diego County

San Diego ADU builder

Detached, attached, garage conversions and junior ADUs, designed and built for your lot.

BHI Builders is a San Diego ADU builder: it designs, permits and builds detached ADUs, attached ADUs, garage conversions and junior ADUs across San Diego County's 19 permit authorities, as one team, under California contractor license 738313, issued in 1997.

CSLB license #738313(760) 803-9747

Your land. A second home.

An ADU can house a parent, give a grown child a start, earn rent, or let you move in while you rent the main house. We take it from the first look at your lot to the final inspection, in La Jolla, Del Mar, Encinitas, Carlsbad and across San Diego County.

Four ways to add a home

  • 01 / Detached

    Detached ADU

    A separate home in the yard, one or two stories. The most privacy and the strongest rental.

    Up to 1,200 sq ft.From $318,040

    The wrong choice when the yard is small or steep: a new foundation and new utility runs are most of the work.

    About this type
  • 02 / Attached

    Attached ADU

    Built onto the side or back of your house, with its own entrance. Sharing a wall saves on foundation and utility runs.

    Up to 1,200 sq ft.From $244,301

    The wrong choice when the only place it fits is the front setback or over the house's main drain.

    About this type
  • 03 / Garage

    Garage conversion

    Your garage becomes a full home. Usually the fastest path, because the slab, walls and roof are already there.

    Keeps the garage's footprint.From $95,862

    The wrong choice when the slab is cracked or too low, or the garage sits in the City's Beach Impact Area, where its parking must be replaced.

    About this type
  • 04 / Junior

    Junior ADU

    Up to 500 square feet carved out of your house, with its own entrance and an efficiency kitchen. Ideal for a parent or a caregiver.

    Up to 500 sq ft.From $82,560

    The wrong choice when you want to rent it and live elsewhere: a junior ADU that shares a bathroom needs the owner on the property.

    About this type

On the call we tell you which one fits your lot, including if the answer is none.

How an ADU comes together

A rendered one-bedroom concept ADU built in a backyard from the ground up: the foundation dug and poured, the wood framing and roof raised, the walls, cladding and glass closed in, and the finished ADU with its patio
  1. 01Site and layout.. We mark the footprint and find the sewer, water and power lines it will tie into.
  2. 02Foundation.. Trenches, rebar and the plumbing under the slab are inspected, then the concrete is poured.
  3. 03Framing.. Walls, then the roof structure, then sheathing that makes the shape solid.
  4. 04Systems.. Plumbing, wiring and ducts run through the open walls before they're insulated.
  5. 05Weather-tight.. Windows, roofing and the weather barrier close it in.
  6. 06Finishes.. Drywall, cabinets, tile, floors and fixtures. Final inspection, then the keys.

What moves the price.

$82,560 to $428,632

Plain-spec planning range across the four types today. Your size, site and finishes move it.

How much does an ADU cost in San Diego County?

TypePlain specLowHigh
Detached ADU800 sq ft$318,040$428,632
Attached ADU600 sq ft$244,301$331,021
Garage conversion450 sq ft$95,862$131,732
Junior ADU400 sq ft$82,560$112,734

BHI's range model, October 2026. Planning ranges at a plain spec, not a quote for your lot.

  1. Size. The biggest lever. Every room adds framing, finishes and fees.
  2. Your site. Slope, tight access and distance to the sewer line add excavation and labor.
  3. Utilities. A new sewer lateral or a bigger electrical panel can add five figures. We check both on the first visit.
  4. Finishes. Cabinets, tile, windows and fixtures can move the total more than the floor plan does.
  5. Fees. State law bars impact fees on ADUs of 750 square feet or less. Above that, a fee can be charged in proportion to the main house.

Price my ADU

Rendered interior of a one-bedroom concept ADU: a white sofa, wood kitchen cabinets with under-cabinet light, a stainless refrigerator and range, and a round dining table with two chairs

One to two years, start to finish.

Design and engineering
1 to 3 months
City review and permits
2 to 6 months
Construction
4 to 8 months

Garage conversions and junior ADUs move faster. A preapproved plan can shorten City review to about 30 days.

From our own permit record

BHI's two most recent County ADUs each spent about seven months in plan review. The solar ADU's plans went to the County in January 2025 and its permit issued in August 2025; the two-story ADU's went in November 2023 and issued in July 2024. State law gives a city or county 60 days to decide a complete ADU application, and 15 business days to say whether it is complete.

Step inside

Light from two sides, a kitchen that fits real cooking, and a bedroom that feels like its own place. This is what 800 square feet can be.

Four steps, one team.

  1. Visit. We walk the lot with you and check what the rules and utilities allow.

  2. Design. Plans drawn around your lot and the way you will use the ADU.

  3. Permits. We prepare the submittal and answer the City's corrections.

  4. Build. One crew from foundation to final inspection.

Where we build ADUs

A permit in Escondido runs through the City; in Rancho Santa Fe or Hidden Meadows it runs through the County of San Diego. We submit to all 19 offices in the county.

All 19 permit authorities: San Diego, Carlsbad, Chula Vista, Coronado, Del Mar, El Cajon, Encinitas, Escondido, Imperial Beach, La Mesa, Lemon Grove, National City, Oceanside, Poway, San Marcos, Santee, Solana Beach, Vista, Unincorporated San Diego County.

Find who issues your permit

ADUs we've built.

Three of them, from the record

  1. Two-story ADU and a junior ADU1,152 sq ft detached ADU with a deck and garage, plus a 498 sq ft junior ADU · North County Metro, near Escondido · County permits issued July 2024, completed 2024
  2. Two detached ADUs and a garage conversionTwo 940 sq ft detached ADUs and a 320 sq ft garage conversion · Escondido · City of Escondido permits issued June 2025
  3. ADU with rooftop solarSingle-story, L-shaped, solar on both wings · Hidden Meadows, near Escondido · County plans submitted January 2025, permit issued August 2025

See all projects

BHI Builders’ work is truly incredible! I had such a great experience working with this company and would highly recommend them for any construction project. Their communication was excellent throughout the entire process, and every member of the team was professional, friendly, and a pleasure to work with. I couldn’t be happier with the results!

Nila Makhfi, on Google

Every ADU on our permit record

Photographs show a finished unit. A permit record shows when the drawings went in, when the permit issued and whether the work was finaled. These are ours. Ask any builder you talk to for the same dates.

UnitPermit officeApplicationPermit issuedStatus
1,152 sq ft two-story detached ADU, with a deck and a garageCounty of San DiegoNovember 2023July 2024Completed
498 sq ft junior ADU above the garage, same lotCounty of San DiegoDecember 2023April 2024Completed
Garage conversion with a room above, solar on the roofCounty of San DiegoJanuary 2025August 2025Issued
Two 940 sq ft detached ADUs on one lotCity of EscondidoNot publishedJune 2025Issued
320 sq ft garage converted to an ADU, same lotCity of EscondidoNot publishedJune 2025Issued

The County publishes application dates. Escondido's weekly permit list carries issue dates only.

What building ADUs here has taught us

Plan review is the long part, and the clock only runs on a complete set. State law gives the County 60 days to decide a complete application, and the two County ADUs above each took about seven months. The junior ADU on the same lot, a smaller set of drawings, came back in about three and a half. So we spend the extra week before submittal on the title report, the survey and the fire district's sign-off, rather than the extra month after.

The city line decides who reviews you. Two of the three projects above carry Escondido mailing addresses and took County permits, because the lots sit outside the city limits. The third sits inside Escondido, where the City issued its permits in June 2025 under rules it replaced on July 29, 2026. A unit filed there today falls under Ordinance 2026-13R and its two tiers.

How do I choose an ADU builder in San Diego?

No list settles who the best ADU builder in San Diego is for your lot. Five checks sort the field in an afternoon. Run them on every builder you talk to, us included.

  1. The license, and who holds it.

    Look the number up on the Contractors State License Board's site. It shows the class, whether the bond and workers' compensation are on file, and any complaint the Board has disclosed. A general building contractor holds class B.

    License 738313 is class B and has been held by Ben Tabrizi since the Board issued it on July 21, 1997. It is current through September 30, 2028. Check it on CSLB

  2. A permit record you can read.

    The County of San Diego publishes its permits by contractor license number, and the City of San Diego and Escondido publish theirs by address. Ask for the application and issue dates of the last three ADUs, then look them up.

    The table above is ours. The agencies tie 75 permits to our license, 2000 to 2025. See the projects

  3. ADUs of your kind.

    A two-story detached unit, a garage conversion and a junior ADU inside the house are different jobs with different inspections. Ask for one of the kind you want, with its dates.

    All four kinds are on our record: a two-story detached ADU, a junior ADU above a garage, a garage conversion with a room above, and two detached units on one Escondido lot.

  4. Reviews at their source.

    Read them on Google and on the Better Business Bureau's site, not quoted on the builder's own page, and count them.

    Google shows 17 reviews at 5.0. The Better Business Bureau rates us A+. Read the reviews

  5. One person who answers for the job.

    Ask who you will call in week twelve, and whether the drawings, the permit and the construction sit on one contract.

    Koosha Tabrizi, our project manager, from the first call to the final inspection, on one contract. Book a call

Questions homeowners ask

How much does an ADU cost in San Diego?

At a plain spec, our calculator puts a detached ADU of about 800 square feet at $318,040 to $428,632. A garage conversion starts near $95,862. Your site, utilities and finishes decide where you land.

How big can an ADU be?

In the City of San Diego, detached and attached ADUs can be up to 1,200 square feet. A junior ADU is up to 500 square feet inside the house. A garage conversion keeps the garage's existing footprint.

How long does it take?

Most detached ADUs take one to two years from the first drawings to move-in: a few months of design, a few months of City review, then construction. In the City of San Diego, ADUs that reached final inspection averaged about 21.8 months from permit submission. Conversions are faster.

Do I have to replace the parking I lose?

Usually not. The City doesn't require replacement parking when you convert a garage, except in the Beach Impact Area. State law also waives ADU parking near transit.

Can I rent it out?

Yes, for stays of 31 days or longer. Short-term vacation rentals aren't allowed in ADUs in the City of San Diego.

Do I have to live on the property?

Not for an ADU. For a junior ADU, the owner must live on the property unless the junior ADU has its own bathroom.

Will an ADU raise my property taxes?

Only for the value the ADU adds. Your main house keeps its current assessed value.

Can I sell the ADU separately?

In the City of San Diego, sometimes: the City allows ADUs to be sold as condominiums under state law, with conditions. Most owners keep it.

Do you build garage conversions, attached and junior ADUs, or only detached?

All four. BHI builds detached ADUs, attached ADUs, garage conversions and junior ADUs, and the permit record shows each kind. Which one fits your lot is the first thing we settle on the call.

How do I check an ADU contractor's license in San Diego County?

Look the number up on the Contractors State License Board's site, where you can see the classification, the bond, the workers' compensation and any disclosed complaints. BHI's number is 738313, a B General Building license issued in 1997, and the same number is on every page of this site.

Is my lot a fit?

Most single-family lots in San Diego can take one ADU and one junior ADU. Slope, easements, fire zones and the coastal zone can change what fits. We check all of them on the first visit.

Tell us about your lot.

We'll walk it with you and tell you what fits.

The San Diego ADU permit checklist (PDF)

Rules from the City of San Diego and California HCD.

You have the idea. We have the team to build it.

Book a call